loading

 CHZ Lighting -  LED Street Light Manufacturer and LED Flood Light Factory Since 2013

Home   |   PRODUCT   |   Tube lighting   |  

Tube lighting CHZ-LT02-T8 led tube light T8 single or double connect ordinary type

这里可以自定义设置
Tube lighting CHZ-LT02-T8 led tube light T8 single or double connect ordinary type
MODEL
CHZ-LT02-T8
LED CHIPS
SMD 2835
COLOR TEMPERATURE
3000K / 4000K / 5000K / 5700K / 6500K
LUMEN
120LM/W / 160LM/W
LENGTH
60cm/2FT 120cm/4FT 150cm/5FT
BUSHING
T8 - Fixed / Rotating
VOLTAGE
100-240V
POWER FACTOR
0.9
CRI
80
DRIVER CONNECT
Single/Double
MATERIALS
AL+PC
LIFETIME / WARRANTY
35,000 hours / 3 years
WORKING ENVIRONMENT
- 30ºC ~ + 50ºC / 10%-90%RH
CERTIFICATIONS
CE ROHS ISO9001 ISO14001 ISO50001 ISO45001
参数暂无数据

Add success, do you want to check your shopping cart?

暂无分享
该产品后台详情无内容
这里可以自定义设置

Parameters




Model No.
Power(W)
Chips
Chips Qty
Chips S/P
Color
Size(L×W×H)mm
LT02-T8(OVAL)9SMD2835968P12S0.6m/2ftφ26×L600
18SMD283514412P12S1.2m/4ftφ26×L1200
25SMD283519216P12S1.5m/5ftφ26×L1500
LT02-T8(ROUND)9SMD2835968P12S0.6m/2ftφ26×L600
18SMD283514412P12S1.2m/4ftφ26×L1200
25SMD283519216P12S1.5m/5ftφ26×L1500


这里可以自定义设置

CHZ-LT02-T8 Feature

 

1. It adopts semi-aluminum + semi-PC structure, with firm structure and beautiful appearance;

2. The thickness of aluminum material is 0.8mm, and the heat dissipation effect is good; the PC cover has high light transmittance and is not easy to age;

2. Using high-quality LED2835 chip, high luminous efficiency, good stability and long life;

3. Conventional non-isolated drive, optional isolated drive; single-ended, double-ended wiring, flexible to adapt to different needs;

4. The lamp holder is available in fixed or rotatable type, which is easy to install;

6. High luminous efficiency, more than 60% energy saving than traditional fluorescent fluorescent lamps, short return on investment and considerable benefits.

A

Applications

Hotels, hotels, schools, hospitals, factories, warehouses, underground parking lots, etc., are widely used to replace traditional fluorescent fluorescent lamps, and the energy saving effect is very obvious.

Display

这里可以自定义设置

The packaging process is as follows

1. Put on the lamp corner
1. Put on the lamp corner
2. Set on plastic bag
2. Set on plastic bag
3. Put the tube into the PE
3. Put the tube into the PE
4.Put PE foam layer by layer into the box
4.Put PE foam layer by layer into the box
5. Put in the warranty card, prepare to seal
5. Put in the warranty card, prepare to seal
6.Put a hoe on both ends of the box
6.Put a hoe on both ends of the box
这里可以自定义设置

Contact Us

Chat Online 编辑模式下无法使用
Leave Your Message inputting...
Hello, please send your specific needs to the email address: sales@chz-lighting.com or WhatsApp: 0086 15921223752. Thanks.