  Solar street lights are mainly composed of solar cell components, intelligent controllers, maintenance-free batteries, light sources, light poles and structural parts.  The working principle of solar street lights is that solar cell modules convert solar radiation into electricity during the day. Maintenance-free batteries are used to charge the batteries. At night, the load powered by the light source will automatically turn on the light source in the automatic darkness. Intelligent controller, battery protection during overcharging and overdischarging, light source control of open time and switch time. Precautions before and after the installation of solar street lights 1. Determine the location of the floor lamp: Under the reconnaissance geological conditions, if the one-meter-thick surface is soft soil, it should be excavated deeply. At the same time, the following excavation locations are required to confirm Without other facilities (such as cables, pipes, etc.), the top of the street light does not last for a long time, and the position should be changed appropriately.  2. The position lamp (excavation) reserved in the agency meets the standard 1 cubic meter pit: the embedded parts in the pouring position. The embedded part is placed in the middle of the pit, the PVC threading pipe, the other end embedded between the end pieces, the base of the battery and the original ground are kept at the same level (or the top of the screw is at the same level as the original ground, depending on the embedded parts in the venue. Is necessary), there is a side parallel to the road; it is erected on the two poles to ensure that there is no deviation after error. Then fix it in C20 concrete pouring, vibration or impact rod during pouring to ensure the whole compact and strong.  3. The location for completion and timely cleaning.   4. Clean the bolts from the mud residue on the blackboard and impurities in the trench oil. During the concrete solidification process, it is necessary to save water from time to time to completely solidify the concrete (usually more than 72 hours) in order to install the chandelier.



Custom message
Chat Online 编辑模式下无法使用
Leave Your Message inputting...
Hello, please send your specific needs to the email address: sales@chz-lighting.com or WhatsApp: 0086 15921223752. Thanks.