loading

 CHZ Lighting -  LED Street Light Manufacturer and LED Flood Light Factory Since 2013

Beijing miyun area launched city 'and lever action'

by:CHZ Lighting     2020-06-22

in early November, the reporter in gulou west street intersection, linking to the Simon bridge Beijing miyun area ChengGuanWei is organizing workers and construction work, dismantled the original road security lever, and the original function merge into traffic on the security bar rod. It is understood that at present, the miyun area ChengGuanWei has completed preliminary pilot range traffic intersections and work, then, will the rod body in urban areas, in accordance with the law in accordance with the rules, the reduced integration to integrate adjustment, change the appearance.

it is understood that in miyun area within the city a total of 405 root rod body, all will be in accordance with the 'in accordance with the law in accordance with the rules, decrement, integration, change the appearance' the idea, to the district public security bureau and the district highway alignment pole branch belongs to integrate adjustment, other property alignment pole neat unit belongs to 'understand' action 'and' intelligent transportation 'stem rod body. At the same time, the waste and stop using the alignment pole and the box body by the property right unit to remove.

the 'action' and stem 25 points for the pilot to drum tower street, leading traffic road alignment pole integration work, has now finished basic integration, integration after the remaining nine root rod body. Based on this experience, to city replicated in other primary and secondary trunk road.

and lever action, on the project are to set up new rod body, housing, roads on both sides of the new rod body or body required by the relevant departments for approval before can be set up.

'the original security lever dismantled and keep its functionality, merging into traffic signal pole, pole from the number decreases, but the function is still as usual, is to beautify the environment of the street. 'Construction project director jian-feng wang said.

it is worth mentioning that, after the 'and lever action' is strictly forbidden in ShiGongChu new stud, box body, the road on both sides of the new rod body or body required by the relevant departments for approval before can be set up. Next, area ChengGuanWei will expand regulation scope, eliminate alignment pole, potential safety hazard caused by the indiscriminate planted soldering, improve the city view space landscape, improve the image of the city.

Custom message
Chat Online
Chat Online
Leave Your Message inputting...
Hello, please send your specific needs to the email address: sales@chz-lighting.com or WhatsApp: 0086 15921223752. Thanks. Welcome, can I help you?
Sign in with: